Client
Directors of Hollytree Close Ltd
Sector
Local Authority &
Housing Associations
Location
Hollytree Close, Inner Park Road, SW19 6AE
Holly Tree Close
Executive Summary
We at Stamford Contracts are proud to have been entrusted with the successful completion of the window replacement, external repairs, and redecoration works at Hollytree Close, a residential development located on Inner Park Road, SW19 6AE. With our vast experience in handling similar projects, we ensured that all aspects of the job were executed with precision and professionalism.
Our project team remained committed to delivering high-quality workmanship while prioritizing safety and minimizing disruptions to residents. The project aimed to address both aesthetic and functional upgrades to the property, ensuring long-term durability and enhanced energy efficiency.

Project Scope
The works carried out at Hollytree Close included:
Window Replacement: All windows within the block were replaced with modern, energy-efficient units. The installation was carried out with a high degree of precision to ensure compliance with all regulatory standards and design specifications.
External Repairs: A comprehensive series of external repairs were undertaken, focusing on restoring the structural integrity and aesthetic appeal of the building. Masonry repairs and necessary patching work were conducted to prepare the surface for redecoration.
Redecoration: The external façade was thoroughly repainted and redecorated, restoring the property’s original appearance and offering long-term protection from weathering.
Scaffolding and Site Access: To ensure safe and efficient access to the work areas, scaffolding was erected throughout the project. Stringent safety protocols were followed, with regular inspections to maintain safety standards for both workers and residents.
Minor Repairs: In addition to the primary works, the project also included addressing minor wear and tear, including roof repairs and gutter maintenance.
Key aspects of project management included: Communication: Regular meetings were held with both the client and residents, ensuring any concerns were promptly addressed and keeping everyone informed about the project’s progress. Feedback was actively sought to maintain a smooth workflow.
Health and Safety: Safety was our top priority, particularly given the nature of the site, which remained occupied throughout the project. We conducted daily toolbox talks, and site-specific risk assessments were regularly updated to ensure compliance with health and safety regulations.
Quality Control: Rigorous quality checks were performed at every stage of the project. Independent site surveys were carried out to confirm that all installations met the required standards and specifications.
Project Outcome
The completion of the Holly Tree Close project has resulted in a significant upgrade to the property’s appearance and functionality. The newly installed windows have enhanced the energy efficiency of the building, and the external repairs and redecoration have revitalized the façade, giving the property a fresh and modern look.
Residents have expressed their satisfaction with the minimal disruption during the works, and the client has acknowledged the quality and professionalism of the work delivered. The project stands as a testament to Stamford Contracts’ ability to deliver complex projects on time and to a high standard.
In summary, the Hollytree Close project highlights our commitment to delivering top-quality construction and refurbishment services, ensuring client satisfaction, and prioritizing safety at every stage of the project. We look forward to bringing our expertise to future developments, continuing to set high standards in the industry.
