The Art of Precision: Removing an 850kg Safe from the Basement of London Business School
Category Blog
A Challenge Like No Other
When tasked with removing an 850kg safe from the basement of the London Business School, we knew this was no ordinary job. The sheer weight of the safe, combined with the tight space constraints, required meticulous planning and execution. Every single centimetre mattered, and precision was the key to success.
Meticulous Planning and Engineering Considerations
This job demanded more than just muscle, it required engineering expertise, risk assessment, and strategic execution. The safe was housed in the basement, which featured a small lightwell, a partially open, recessed space that allows natural light into lower floors while being visible from the ground floor through railings. This would be our extraction point.
Given the complexity of the task, we factored in multiple considerations:
-
Weight distribution: Ensuring that the lifting equipment and support structures could handle the 850kg load without compromising stability.
-
Wind calculations: A strong gust could have jeopardised the operation, so we meticulously monitored weather conditions and chose a low-wind day for maximum safety.
-
Clearance precision: The tight spatial constraints meant that even a single centimetre of misalignment could have led to complications.
-
Structural integrity: Ensuring that the lightwell and surrounding areas could bear the load as we navigated the safe out of the basement.